Birdwatch Note Rating
2023-12-06 14:05:50 UTC - HELPFUL
Rated by Participant: B398EA6B4ACCC65EF16D4B6335938258FDA6BFE14A2938FFB54041A1D62B940B
Participant Details
Original Note:
The contract value was 20 billion dollars. Estimates however believe it is closer to 25 billion. Construction started on 2011. The first unit became operational at 2020, The 4th unit have received its license on November and is expected to operate in the coming weeks. https://www.worldnuclearreport.org/Barakah-UAE-Grid-Connection-of-First-Commercial-Reactor-in-the-Arab-World.html https://www.enec.gov.ae/news/latest-news/barakah-nuclear-energy-plant-unit-1-successfully-connects-to-uae-transmission-grid/ https://www.fanr.gov.ae/en/media-centre/news?g=5345f050-f8b5-4b41-9b3f-f8ebc7797344
All Note Details