Birdwatch Note Rating
2025-02-08 19:27:06 UTC - NOT_HELPFUL
Rated by Participant: D1EF53399BFA379E824356EF658614B16A8C7877B0CF1B87CCB0D14417582C79
Participant Details
Original Note:
This is misleading. 60 miles of guideway have been completed, into which the tracks will then be laid. Likewise, 50 building such as bridges, tunnels and viaducts have already been completed. https://en.wikipedia.org/wiki/Construction_of_California_High-Speed_Rail https://www.latimes.com/california/story/2024-03-21/high-speed-rail
All Note Details