Birdwatch Note Rating
2025-01-02 12:45:38 UTC - NOT_HELPFUL
Rated by Participant: 419EAF83EF9EC1264800A7D93C93F1E21BE01BC5B26EF89359273A950B88BFAC
Participant Details
Original Note:
The city was in the process of replacing the barriers that were installed back in 2017. The bollard project began in November and was scheduled to last three months. It involves removing and replacing sections of road to take out the existing bollards. https://www.nola.com/news/traffic-barriers-down-on-bourbon/article_19ae4faa-c84d-11ef-bf90-e7ba5e65dca6.html
All Note Details