Original Note:
This is a bridge over a river that will connect to non-elevated track on either side. Only a few miles of the 171 mile initial segment are elevated as needed to cross rivers and existing infrastructure. These larger structures are being built before track is laid. https://hsr.ca.gov/high-speed-rail-in-california/construction-activities-interactive-map/ https://buildhsr.com/construction-packages/construction-package-2-3/ https://buildhsr.com/construction-packages/construction-package-4/