Birdwatch Note Rating
2024-05-04 22:40:43 UTC - HELPFUL
Rated by Participant: CA285273053DFB84734D6F632118A9324833E6E7AA5D211A6EF93B0786A94EA2
Participant Details
Original Note:
This is a bridge over a river that will connect to non-elevated track on either side. Only a few miles of the 171 mile initial segment are elevated as needed to cross rivers and existing infrastructure. These larger structures are being built before track is laid. https://hsr.ca.gov/high-speed-rail-in-california/construction-activities-interactive-map/ https://buildhsr.com/construction-packages/construction-package-2-3/ https://buildhsr.com/construction-packages/construction-package-4/
All Note Details