Birdwatch Note Rating
2024-05-06 12:08:52 UTC - NOT_HELPFUL
Rated by Participant: C608630B78CB543FD796ACACEAE8D607B07737A8C77A15435FD3C4F74C410E12
Participant Details
Original Note:
This is a bridge over a river that will connect to non-elevated track on either side. Only a few miles of the 171 mile initial segment are elevated as needed to cross rivers and existing infrastructure. These larger structures are being built before track is laid. https://hsr.ca.gov/high-speed-rail-in-california/construction-activities-interactive-map/ https://buildhsr.com/construction-packages/construction-package-2-3/ https://buildhsr.com/construction-packages/construction-package-4/
All Note Details