Birdwatch Note Rating
2024-05-05 07:21:37 UTC - HELPFUL
Rated by Participant: 2C0B6C8622426BFE647D56D102B714C1D01C31B0F5A3FCA831567F63BEAFB77A
Participant Details
Original Note:
This is a bridge over a river that will connect to non-elevated track on either side. Only a few miles of the 171 mile initial segment are elevated as needed to cross rivers and existing infrastructure. These larger structures are being built before track is laid. https://hsr.ca.gov/high-speed-rail-in-california/construction-activities-interactive-map/ https://buildhsr.com/construction-packages/construction-package-2-3/ https://buildhsr.com/construction-packages/construction-package-4/
All Note Details