Birdwatch Note Rating
2024-04-17 10:07:08 UTC - HELPFUL
Rated by Participant: 5FAB64F3C2C003CD1E17C02A6FDD17C719E7750EB2D284F53218286B42281A9D
Participant Details
Original Note:
This infographic refers to Phase 1 (of both projects), but incorrectly puts the cost of the full Mumbai Coastal Highway project as the cost of the Phase 1 ($1.6 Billion). The full project is actually 29.2km (costing the $1.6b). https://timesproperty.com/news/post/all-about-mumbai-coastal-road-project-blid6986
All Note Details