Birdwatch Note Rating
2024-03-29 14:11:15 UTC - HELPFUL
Rated by Participant: EFBFCB1B755CA14CEFAA338A8AD0D463C6EECEBEB89AD95969290CC28687B339
Participant Details
Original Note:
Including preparatory works, the bridge was built in 7 years as the project was funded in 1970 and opened to the public in 1977. (1) Additional time needed to rebuild the bridge is needed for analysis, cleanup and demolition. (2) 1: https://en.m.wikipedia.org/wiki/Francis_Scott_Key_Bridge_(Baltimore) 2: https://www.washingtonpost.com/dc-md-va/2024/03/27/baltimore-key-bridge-rebuild-timeline/
All Note Details