Birdwatch Note Rating
2024-03-29 09:20:16 UTC - HELPFUL
Rated by Participant: 20AB4543BD8205C155FAA411DB3667AE50A98C0EB7EEAD286B7DEAEA966ADA08
Participant Details
Original Note:
Including preparatory works, the bridge was built in 7 years as the project was funded in 1970 and opened to the public in 1977. (1) Additional time needed to rebuild the bridge is needed for analysis, cleanup and demolition. (2) 1: https://en.m.wikipedia.org/wiki/Francis_Scott_Key_Bridge_(Baltimore) 2: https://www.washingtonpost.com/dc-md-va/2024/03/27/baltimore-key-bridge-rebuild-timeline/
All Note Details