Birdwatch Note Rating
2024-03-26 12:14:19 UTC - HELPFUL
Rated by Participant: DC3A658C3549485688E3B2661F7C509837409D6255E1B600E6E5397E387A8C4B
Participant Details
Original Note:
No engineering project can be designed to withstand every imaginable disaster. It is too early to tell whether a maintenance issue contributed, if it had a design flaw, or if the collision itself exceeded the risk assessment and what the bridge was built to withstand. https://www.sciencedirect.com/science/article/abs/pii/S0951833920301040 https://www.sciencedirect.com/science/article/pii/S209575642200040X
All Note Details