Original Note:
It is a ridiculously simplistic economic analysis. France built its nuclear power plant fleet between 1970s-1990s, and nuclear power requires the majority of the money in the first 8 years*. It therefore makes little sense to look to it for the causes of French debt/GDP. *p.32 https://www.oecd-nea.org/upload/docs/application/pdf/2020-07/7530-reducing-cost-nuclear-construction.pdf