Birdwatch Note Rating
2022-10-01 10:41:52 UTC - HELPFUL
Rated by Participant: 4C73498A3F804503C2497EFE178E6B3A524EED05004AF80A8C06BB1AB46D57C3
Participant Details
Original Note:
Erosion control has been a known problem for decades for the Surfliner tracks. Stabilization work on a different segment of the same line further down the coast has been happening since the early 2000s, so this issue has been worked on in the past. https://www.delmartimes.net/news/story/2020-06-03/more-money-allocated-to-secure-tracks-on-del-mar-bluffs
All Note Details