Birdwatch Note Rating
2022-10-01 14:20:05 UTC - HELPFUL
Rated by Participant: 163850C98B916600A9CD1255A2BE4E9E3233790438271534C687F955B7106EA2
Participant Details
Original Note:
Erosion control has been a known problem for decades for the Surfliner tracks. Stabilization work on a different segment of the same line further down the coast has been happening since the early 2000s, so this issue has been worked on in the past. https://www.delmartimes.net/news/story/2020-06-03/more-money-allocated-to-secure-tracks-on-del-mar-bluffs
All Note Details