Original Note:
When the Keystone XL pipeline construction was stopped by the Biden Executive Order, the pipeline was only 8% built. The original completion date was targeted for 2030 when oil could start flowing through it. https://www.reuters.com/article/factcheck-keystonepipelinexl-builtandpai/fact-check-though-keystone-xl-pipeline-had-secured-most-of-its-funding-it-was-only-8-constructed-idUSL1N2LA2SQ https://www.snopes.com/news/2022/03/14/open-keystone-xl-pipeline/