The Keystone XL was only 8% completed at the time Biden EO stopped work on it. The original completion date wasn't scheduled until 2030 when oil could start flowing through it. https://www.reuters.com/article/factcheck-keystonepipelinexl-builtandpai/fact-check-though-keystone-xl-pipeline-had-secured-most-of-its-funding-it-was-only-8-constructed-idUSL1N2LA2SQ