The Keystone XL pipeline's original scheduled opening date was 2030. At the time construction was halted, it was only 8% completed. https://www.reuters.com/article/factcheck-keystonepipelinexl-builtandpai/fact-check-though-keystone-xl-pipeline-had-secured-most-of-its-funding-it-was-only-8-constructed-idUSL1N2LA2SQ