Birdwatch Note
2022-02-25 15:36:05 UTC - MISINFORMED_OR_POTENTIALLY_MISLEADING
The original Keystone Pipeline is still in full operation from Alberta down to Texas and Illinois. https://www.keystonexl.com/maps/ https://www.gem.wiki/Keystone_Oil_Pipeline The Keystone XL never had oil flowing through it, as it was only 8% completed when construction was halted. Its original completion date was 2030. https://www.reuters.com/article/factcheck-keystonepipelinexl-builtandpai/fact-check-though-keystone-xl-pipeline-had-secured-most-of-its-funding-it-was-only-8-constructed-idUSL1N2LA2SQ
Written by 9795BF8962792425EFA8D2F4F92685B4
Participant Details
Original Tweet
Tweet embedding is no longer reliably available, due to the platform's instability (in terms of both technology and policy). If the Tweet still exists, you can view it here: https://twitter.com/foo_bar/status/1496890682396614660
Please note, though, that you may need to have your own Twitter account to access that page. I am currently exploring options for archiving Tweet data in a post-API context.
All Information
- ID - 1497233950745534483
- noteId - 1497233950745534483
- participantId - 9795BF8962792425EFA8D2F4F92685B4
- noteAuthorParticipantId -
- createdAtMillis - 1645803365778
- tweetId - 1496890682396614660
- classification - MISINFORMED_OR_POTENTIALLY_MISLEADING
- believable - BELIEVABLE_BY_MANY
- harmful - CONSIDERABLE_HARM
- validationDifficulty - EASY
- misleadingOther - 0
- misleadingFactualError - 1
- misleadingManipulatedMedia - 0
- misleadingOutdatedInformation - 0
- misleadingMissingImportantContext - 1
- misleadingUnverifiedClaimAsFact - 0
- misleadingSatire - 0
- notMisleadingOther - 0
- notMisleadingFactuallyCorrect - 0
- notMisleadingOutdatedButNotWhenWritten - 0
- notMisleadingClearlySatire - 0
- notMisleadingPersonalOpinion - 0
- trustworthySources - 1
- summary
- The original Keystone Pipeline is still in full operation from Alberta down to Texas and Illinois. https://www.keystonexl.com/maps/ https://www.gem.wiki/Keystone_Oil_Pipeline The Keystone XL never had oil flowing through it, as it was only 8% completed when construction was halted. Its original completion date was 2030. https://www.reuters.com/article/factcheck-keystonepipelinexl-builtandpai/fact-check-though-keystone-xl-pipeline-had-secured-most-of-its-funding-it-was-only-8-constructed-idUSL1N2LA2SQ
Note Status History
createdAt | timestampMillisOfFirstNonNMRStatus | firstNonNMRStatus | timestampMillisOfCurrentStatus | currentStatus | timestampMillisOfLatestNonNMRStatus | mostRecentNonNMRStatus | participantId |
2022-02-25 15:36:05 UTC (1645803365778) |
1969-12-31 23:59:59 UTC (-1) |
1969-12-31 23:59:59 UTC (-1) |
1969-12-31 23:59:59 UTC (-1) |
47AD3BD4ED0E64C9EA74DB3A322FA6AA5E5F8D84E57A6E405CC624F53C571EC8 | |||
2022-02-25 15:36:05 UTC (1645803365778) |
1969-12-31 23:59:59 UTC (-1) |
1969-12-31 23:59:59 UTC (-1) |
1969-12-31 23:59:59 UTC (-1) |
9795BF8962792425EFA8D2F4F92685B4 |
Note Ratings
rated at | rated by | |
2022-03-01 19:01:50 -0600 | 3CCE8E976CA3D85B2F94E380599088188C439FD865C5FBC4B855414160D6EC38 | Rating Details |
2022-02-25 10:17:58 -0600 | 5FB9B68061EDA5E93528C6A547111421B76EBB9BCE4A9F6DF39B3E468E23455C | Rating Details |
2022-03-02 15:41:21 -0600 | E5012B37B7F381A13606D1EA85495EAD4514CBD51B310F23D9269F37CEF637ED | Rating Details |
2022-03-02 23:17:54 -0600 | EB26135AA25EC18D5C1DC9B32A8DEAEF3B47F23E0D61425499DD3EF4EBD0E5EC | Rating Details |
2022-02-25 10:17:58 -0600 | Rating Details | |
2022-03-02 23:17:54 -0600 | Rating Details | |
2022-03-01 19:01:50 -0600 | Rating Details | |
2022-03-02 15:41:21 -0600 | Rating Details |