Birdwatch Note Rating
2022-10-01 00:49:33 UTC - HELPFUL
Rated by Participant: 8906A4BEFB6B3B46F4E7730FFA56681069C2389CA3808677812EC595E09AAE37
Participant Details
Original Note:
Erosion control has been a known problem for decades for the Surfliner tracks. Stabilization work on a different segment of the same line further down the coast has been happening since the early 2000s, so this issue has been worked on in the past. https://www.delmartimes.net/news/story/2020-06-03/more-money-allocated-to-secure-tracks-on-del-mar-bluffs
All Note Details