Birdwatch Note Rating
2022-07-07 22:56:12 UTC - HELPFUL
Rated by Participant: AD8DC42A0C7729F56C4F30E56E6262C5285C3CADAB680599CAF1924DEA605484
Participant Details
Original Note:
The original Keystone Pipeline has been in full operation from Alberta down to Texas and Illinois. It has not stopped flowing since Biden took office. https://www.keystonexl.com/maps/ https://www.gem.wiki/Keystone_Oil_Pipeline The Keystone XL, not to be opened until 2023 at the earliest, was the one cancelled by the Biden Administration. https://www.reuters.com/article/factcheck-keystonepipelinexl-builtandpai/fact-check-though-keystone-xl-pipeline-had-secured-most-of-its-funding-it-was-only-8-constructed-idUSL1N2LA2SQ https://www.snopes.com/news/2022/03/14/open-keystone-xl-pipeline/
All Note Details